Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

Front panel
Note on system information backup / restore
I
The front panel module contains the Chassis ID EPROM that contains
system information like server name and model, housing type, serial
number and manufacturing data.
To avoid the loss of non-default settings when replacing the system
board, a backup copy of important system configuration data is
automatically stored from the system board NVRAM to the Chassis ID
EPROM. After replacing the system board the backup data is restored
from the Chassis ID board to the new system board.
V
CAUTION!
For that reason the front panel module and system board must not be
replaced simultaneously! In this case, restoring the system configuration
data on the system board would fail.

13.1.1 Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less

13.1.2 Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Locating the defective server" on page 55
3.
"Disabling SVOM boot watchdog functionality" on page 76
4.
"Disabling BitLocker functionality" on page 75
5.
"Shutting down the server" on page 59
6.
"Extending/removing the server from the rack" on page 60
7.
"Opening the server" on page 64
8.
"Locating the defective component" on page 58
312
Upgrade and Maintenance Manual
RX100 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents