Toro Z580 DFI Z Master Service Manual page 64

Table of Contents

Advertisement

11. Remove the outside hex head flange nut at the top
of the inner deck lift plate. Remove the hitch pin
assembly from the bolt (Fig. 152).
Fig 152
12. Loosen the inner hex head flange nut. Pivot the
inner deck lift plate up (Fig. 153).
Fig 153
Z580/Z589 DFI Z Master Service Manual
13. Raise the floor pan.
14. Remove the front bolt and nut that secure the 2
deck lift arms to the deck lift cross shaft assembly.
Pivot the deck lift arms away from the cross shaft
assembly and remove the bushing from the hole in
the cross shaft assembly tab (Fig. 154).
PICT-2988a
15. Remove the E-clip from the deck lift arm pivot (Fig.
155).
PICT-2991a
CHASSIS
Fig 154
PICT-3000a
Fig 155
PICT-3002a
3
3-43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z589 dfi z master742537425474253cp74254cp

Table of Contents