CHASSIS
11. Install a cable tie securing the throttle cable to the
bracket located behind the voltage regulator (Fig.
108).
3
12. Install a cable tie securing the throttle cable to the
fuel tank fitting located on the operator's side of the
fuel tank (Fig. 109).
3-30
Fig 108
IMG-0414a
Fig 109
IMG-0416a
13. Install the front engine shield assembly (Fig. 110).
Fig 110
14. Connect the negative battery cable.
15. Start the unit and operate the throttle control, to
check for proper function and adjustment.
Z580/Z589 DFI Z Master Service Manual
IMG-0303a