Toro Z580 DFI Z Master Service Manual page 51

Table of Contents

Advertisement

CHASSIS
11. Install a cable tie securing the throttle cable to the
bracket located behind the voltage regulator (Fig.
108).
3
12. Install a cable tie securing the throttle cable to the
fuel tank fitting located on the operator's side of the
fuel tank (Fig. 109).
3-30
Fig 108
IMG-0414a
Fig 109
IMG-0416a
13. Install the front engine shield assembly (Fig. 110).
Fig 110
14. Connect the negative battery cable.
15. Start the unit and operate the throttle control, to
check for proper function and adjustment.
Z580/Z589 DFI Z Master Service Manual
IMG-0303a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z589 dfi z master742537425474253cp74254cp

Table of Contents