Agilent Technologies Agilent E5250A User Manual page 57

Agilent technologies low leakage switch mainframe user's guide
Table of Contents

Advertisement

Table 3-2
NOTE
SCPI Commands for Self-Test
Test Item
Description
Controller
Executes Controller Test,
Test
then returns test result.
Returns test result.
Clears test result.
Front Panel
Executes I/F Test, then
Interface
returns test result.
(I/F) Test
Returns test result.
Clears test result.
Relay Test
Executes Relay Test, then
returns test result.
Returns test result.
Clears test result.
Front Panel Interface Test
After the :DIAG:TEST:FRAM:EXEC? FPAN command is executed, the Remote,
System Fail, Fail, and Local/Self Test LEDs on the E5250A front panel blink for
about 10 seconds. If an LED does not blink, the LED is defective.
Confirm that the four LEDs are blinking, then press the
E5250A front panel within 10 seconds. The LEDs should stop blinking.
If you do not press the
fail result for the Front Panel Interface Test, which turns on the Fail LED.
If you pressed
Local/Self Test
it means the
Local/Self Test
If you find any problem, contact your nearest Agilent Technologies Service Center.
Agilent E5250A User's Guide, Edition 11
:DIAG:TEST:FRAM:EXEC? CONT
:DIAG:TEST:FRAM:STAT? CONT
:DIAG:TEST:FRAM:CLE CONT
:DIAG:TEST:FRAM:EXEC? FPAN
:DIAG:TEST:FRAM:STAT? FPAN
:DIAG:TEST:FRAM:CLE FPAN
:DIAG:TEST:CARD:EXEC? ALL
or Card No. (1, 2, 3, or 4)
:DIAG:TEST:CARD:STAT? ALL
or Card No. (1, 2, 3, or 4)
:DIAG:TEST:CARD:CLE ALL or
Card No. (1, 2, 3, or 4)
key within 10 seconds, the E5250A returns a
Local/Self Test
key within 10 seconds, and the Fail LED still turns on,
key is defective.
Executing Self-Test and Leak Test
Executing Self-Test
SCPI Command
Local/Self Test
key on the
3-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agilent e5252aAgilent e5255a

Table of Contents