Nortel DMS-100 Series Maintenance Manual page 80

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

1-64 Maintenance overview
The system skips and tests the drawer on later passes of the BRT if
Single-drawer test The single-drawer test is for retest purposes if a
failure occurs during the system test. This test runs from the LCM MAP
level and is part of the TST DRWR command string. The RELAY option
allows the BRT to run without running the main DRWR test. The BRT does
not run unless you specify the RELAY option.
You ManB the drawer before the system runs the test. The system prompts
you if the drawer is InSv, ISTb, or SysB. The manual BRT cannot run on a
drawer where the LCM node is ManB, SysB, C-side busy (CBsy), or OffL.
The system displays a message that indicates that the request is invalid and
gives the current state of the node.
The single-drawer test displays a PM181 log with the results of the test. The
system also displays a response at the MAP terminal and, if necessary, a card
list that indicates the failed drawer.
If the system cannot run a single drawer test, the system does not set the
drawer ISTb. You can return the drawer to service to the previous state.
Restarts The following information applies to manual and system-level
restarts:
297-8211-550 Standard 05.01 August 1999
a drawer was earlier OOS
call processing is in progress
warm or cold restarts
— The system aborts all drawer-level tests.
— The system saves ISTb reasons.
— The system aborts all LCM-level tests. These tests are system level
if the tests are in the window. The test resumes after the restart. The
system does not retest LCMs that the system tested.
reload
— The system resets the BRT as if you issue the RESET option of the
BICRELAY command.
— The system retains the ON/OFF settings of the BICRELAY
command.
— The system retains the state of the SUPPRESS and ALLOW
commands.
— The system clears ISTb reasons.