Nortel DMS-100 Series Maintenance Manual page 539

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

Replacing an NT8X02 card in a BCU
At your Current Location
1
Proceed only if you have been directed to this card replacement procedure from
a step in a maintenance procedure, are using the procedure for verifying or
accepting cards, or have been directed to this procedure by your maintenance
support group.
2
Obtain a replacement card. Ensure the replacement card has the same
product equipment code (PEC), including suffix, as the card to be removed.
3
If you were directed to this procedure from the Alarm Clearing Procedures , go
to step 6. Otherwise, continue with step 4.
At the MAP terminal
4
Post the OPAC PES with the BCU containing the battery charger controller
(BCC) card to be replaced by typing
>MAPCI;MTC;PM;PES;POST opmpes
and pressing the Enter key.
where
opmpes
is the OPAC PES duscrimination number (0–253)
Example of a MAP response:
OPMPES
OPMPES
Common
AC
FL0 FL1 CL0 CL1
.
.
BCC
0
1
0=.
.
.
1=.
.
.
5
Busy the BCC driver (BCCDVR) card by typing
>BSY BCCDVR
At bay 1 of the OPAC
6
Turn switch on front of the BCC (NT8X02) card to the OFF position.
7
Replace the NT8X02 card by using the procedure "Replacing a card." When
the card is replaced, return to this step.
8
Turn the switch on the BCC (NT8X02) card to the ON position.
DMS-100 Family OPAC Maintenance Manual XPM12 and up
RED
AMBER
0
0
2 Cond: GREEN
Rectifiers
BCCDVR
.
.
.
2
3
Temp
.
. EHT ELT
FRNT SIDE
.
.
.
.
Card replacement procedures 8-173
BCU
GREEN
OFFL
3
0
REM2
2
1
RMM
Audit Week
HBT
.
2
PESALRM
ECU FSP
.
.
.
Door
BCCFUSES
0
1
.
.
.
.
NT8X02
(continued)
2
.
.

Advertisement

Table of Contents
loading

Table of Contents