Battery Capacity Test Opac - Nortel DMS-100 Series Maintenance Manual

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

13-2
13-2
Routine maintenance procedures
Battery capacity test
OPAC
Application
Use this procedure to check the capacity of Eagle Picher batteries in an
outside plant access cabinet (OPAC). The OPAC has a multiline test unit
(MTU).
Interval
Perform this procedure at intervals of six months when MTU measurements
comply to specifications. Perform this procedure at intervals of three
months if the MTU measurements do not comply to specifications.
Do not perform this procedure at the same time as the automatic battery test
procedure.
Common procedures
There are no common procedures.
Action
This procedure contains a summary flowchart and a step action procedure.
The summary flowchart provides an overview of the procedure. Use the list
of steps following the flowchart to perform this procedure.
297-8211-550 Standard 05.01 August 1999
13-2

Advertisement

Table of Contents
loading

Table of Contents