Nortel DMS-100 Series Maintenance Manual page 725

Outside plant access cabinet (opac)
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

Summary of post charge test failure
Access the
PES level
of the MAP
Post the OPAC
identified in the
PES117 log
Disable
audit
Charge pair
identified in
PES117 log
OpenCkt pair
identified in
PES117 log
Measure pair
identified in
PES117 log
Bsy and
RTS the
BCCDVR
Enable
audit
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Routine maintenance procedures 13-77
Post charge test failure
OPAC
This flowchart summarizes the
procedure.
Use the instructions in the
procedure that follows this
flowchart to perform the
procedure.
(continued)

Advertisement

Table of Contents
loading

Table of Contents