Application
Use this procedure after an open-circuit test failure to determine if outside
plant access cabinet (OPAC) batteries need replacement.
Interval
Perform this procedure after every open-circuit test failure.
Common procedures
There are no common procedures.
Action
This procedure contains a summary flowchart and a list of steps. Use the
flowchart to review the procedure. Follow the steps to perform the
procedure.
13-69
Routine maintenance procedures
DMS-100 Family OPAC Maintenance Manual XPM12 and up
Open-circuit test failure
13-69
13-69
OPAC