Task Flow: Check Power; Ensuring Power Cord Is Installed - Avaya 5000 Series Troubleshooting Manual

Ethernet routing switch
Hide thumbs Also See for 5000 Series:
Table of Contents

Advertisement

Task flow: Check power

Use the following task flow to assists you to confirm that the ERS 5600 series device is powered
correctly.
Figure 16: Check power

Ensuring power cord is installed

About this task
Confirm the power cord is properly installed for the device.
Refer to Installing the Avaya Ethernet Routing Switch 5000 Series, NN47200-300 for details
regarding proper cord installation.
Troubleshooting
Check power
December 2013
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

5600 series

Table of Contents