Stand-alone installation testing
............................................................................................................................................................................................................................................................

OC-3 low-speed testing

OC-3 low-speed LNW37 PTM testing procedure
Perform the following steps for all Alcatel-Lucent 1850 TSS-60 shelf function unit or
growth slots containing LNW37 (OC-3 OLIU) circuit pack.
Note:
on the OLIU, make the connections at the LGX equipment in order to verify correct
installation and labeling of the fibers.
Note:
associated fibers, then move PTMs to ports that are fibered.
LBOs are installed on the OLIU faceplate IN port.
........................................................................................................................................................................................................................
1
Beginning from the Top (G) side of the Alcatel-Lucent 1850 TSS-60 shelf, locate the first
function unit slot position that contains an LNW37 circuit pack.
........................................................................................................................................................................................................................
Insert a 15-dB LC-type LBO into the top IN connector (port 1) of the first PTM equipped.
2
Refer to
Connect the fibers labeled IN and OUT from the LGX to the OLIU (port 1).
........................................................................................................................................................................................................................
3
Connect the Port 1 IN connector to the Port 1 OUT connector (at the LGX) of the OC-3
OLIU, using an optical fiber jumper cable. Refer to
proper fiber cleaning instructions.
Result:
LEDs should be lit on the SYSCTL circuit pack.
After approximately 20 seconds the flashing FAULT LED should extinguish on the
OC-3 OLIU and the FAULT, MJ and NE LEDs should be lit on the SYSCTL circuit
pack.
............................................................................................................................................................................................................................................................
6 - 2 8
CAUTION
Laser Safety
When connecting fiber loops between the IN and OUT ports on optical circuit
packs, always connect to the IN port first and then the OUT port. This will
prevent any optical radiation from being present at the fiber end.For more
detailed information and safety precautions, refer to
When reference is made to optical fiber loopback connections to IN and OUT
Equip all ports with PTMs provided. If all ports don't have PTMs, but have
Appendix D, "Installing fiber connectors and
The FAULT LED on the OC-3 OLIU will begin flashing and the MN and NE
OC-3 low-speed testing
Chapter 1,
LBOs".
Appendix B, "Fiber cleaning"
Issue 1 January 2009
"Safety".
for
365-372-603R2.0