Sign In
Upload
Manuals
Brands
Alcatel Lucent Manuals
Switch
1675 LambdaUnite
Alcatel Lucent 1675 LambdaUnite Manuals
Manuals and User Guides for Alcatel Lucent 1675 LambdaUnite. We have
1
Alcatel Lucent 1675 LambdaUnite manual available for free PDF download: Installation And System Turn-Up Manual
Alcatel Lucent 1675 LambdaUnite Installation And System Turn-Up Manual (648 pages)
MultiService Switch (MSS)
Brand:
Alcatel Lucent
| Category:
Switch
| Size: 17.45 MB
Table of Contents
List of Tables
13
Table of Contents
13
Part II: NE Provisioning and Stand-Alone Installation Test
28
Receiver Sensitivity Test
29
1+1 MSP/APS Test Setup
29
2-Fiber MS-Spring/Blsr Test Setup
29
Part I: Physical and Power Installation
47
5 Power, Software and Circuit Pack Installation
49
Safety
52
4 System Cabling and Final Assembly
49
1 Safety
53
Optical Circuit Pack Specifications
64
ESD Symbol
70
Climatic Limits (Operation)
86
General Information
89
2 General Information
90
Grounding Scheme
94
ESP Subrack Bonding Point
95
Required Tools
100
Required Test Equipment
100
Sequence of Steps
103
Mechanical Installation
109
3 Mechanical Installation
110
ETSI-2 Rack Specifications
113
Rack Layout (ETSI-2 Rack)
114
Eye Bolt Mounting
116
Top/Bottom Plate Layout (ETSI-2 Rack)
117
Floor Mounting (ETSI-2 Rack)
119
Anchoring Kit SE12150W-1 - CC408414951
120
Mounting Holes (ETSI-2 Rack)
121
Top Mounting Fixture (ETSI-2 Rack)
122
Mounting the Rack Extension (Width)
124
Rack Extension Height, 600 MM
126
Rack Extension Height, 750 MM
126
Rack Line-Up Without Rack Extensions (Width)
128
Rack Line-Up with Rack Extensions (Width)
129
PDP Specifications
130
PDP Layout
131
Mounting the MDIO Terminal Rail
132
Subrack Specifications
133
Subrack Mounting Dimensions
134
Subrack Mounting
135
Mounting Positions (ETSI-2 Rack)
136
Fiber Guide Mounting
140
NEBS-2000 Rack Specifications
144
Eye Bolt Mounting
147
Top/Bottom Layout of Plate (NEBS-2000 Rack)
148
Drilling Template (NEBS-2000 Rack)
149
Floor Mounting (NEBS-2000 Rack)
150
Anchoring Kit (NEBS-2000 Rack)
151
Shim Plates (NEBS-2000 Rack)
152
Mounting Holes (NEBS-2000 Rack)
153
Top Mounting Fixture (NEBS-2000 Rack)
154
Mounting the Rack Extension (Width)
156
Rack Extension Height, 600 MM
158
Rack Extension Height, 750 MM
158
Rack Line-Up Without Rack Extensions (Width)
160
Rack Line-Up with Rack Extensions (Width)
161
PDP Specifications
162
PDP Layout
163
Subrack Mounting Dimensions
165
Fiber Guide Mounting
171
Mounting Positions - One Subrack (NEBS-2000 Rack)
173
System Cabling and Final Assembly
175
Cable Block Diagram
176
Cable List
177
PDP Connection (Power Input Cables)
181
Securing the Power Input Cables
183
Routing the Power Input Cables
184
Available PI Cables
185
PDP Connection (PI Cables)
186
Routing the PI Cables (PDP Side)
187
Connecting the PI Cables (PI/100 / Subrack Side)
189
Pin Assignment (PI Cables)
190
Available Fan Power Cables
191
Fan Power Cable
192
Routing to the Fan Unit
193
Routing to the Pis
194
PDP Grounding
195
Office and Subrack Grounding
197
Cable Management (Top Access)
200
Cable Management (Bottom Access)
201
Available Controller Cables
202
Controller Cable
203
Routing of the Controller Cable
204
Available Subrack Alarm Cables
205
Pin Assignments (Subrack Alarm Cables)
206
Connectors of the Subrack Alarm Cables
206
Connections of the Subrack Alarm Cables (PDP Side)
207
Routing the Subrack Alarm Cables (PDP Side)
207
Routing the Subrack Alarm Cables (Subrack Side)
208
Connector of the Station Alarm Cable
210
Pin Assignment (Station Alarm Cable)
211
Routing the Station Alarm Cable
212
Connector/Wire Technical Data (Single Coax Cable, STM-1E)
215
STM-1E Cabling with Rack Extension (Width)
216
STM-1E Cabling Without Rack Extension (Width)
217
Mounting of the Cable Bracket
218
STM-1E Cabling with Rack Extension (Width)
219
Mounting of the Cable Bracket
220
IMS Assembly Procedure
222
Crimp Tool and die
223
Example of Mounted ECI51 Interface Paddle Board
224
DS3/EC1 Cabling Without Rack Extension (Width)
226
Pin Assignment (MDI/MDO Cables)
228
Connector of the MDI/MDO Cables
228
Routing the MDI/MDO Cable (Subrack Side)
229
Routing Via the MDIO Terminal Rail
230
Connector of the User Byte Cables
233
Pin Assignment (User Byte Cables)
234
Routing the User Byte Cables
235
Connector of the 100/110 Ω DS1 Station Clock Output Cables
236
Connector of the 100/110 Ω DS1 Station Clock Input Cables
238
Routing the Station Clock I/O Cables
239
Connector of the 120 Ω E1 Station Clock Output Cables
240
Connector of the 120 Ω E1 Station Clock Input Cables
241
Routing the Station Clock I/O Cables
242
Connector of the 75 Ω E1 Station Clock Output Cables
243
Connector of the 75 Ω E1 Station Clock Input Cables
244
Routing the Station Clock I/O Cables
245
CIT Connection (LAN Crossed)
247
Routing LAN1 (User Panel)
247
Pin Assignment (LAN Cables, Straight)
248
HUB Connection (LAN Straight)
248
Routing LAN2, LAN3 and LAN4 (CI-CTL)
249
OP155M Layout
252
OPLB/PAR8 Parent Board with OM155 SFP Modules
253
OP622 Layout
254
OP2G5 Layout
255
OP2G5/PWDM with OM2G5/PWDM Modules
256
OP10 Layout
257
OP10D/PAR2 with OM10 Modules
258
OP10D/PAR2XFP Layout
259
GE1 Circuit Packs
261
GE10PL1/1A8 Circuit Pack
262
Side Guides
263
When to Use a Rack Extension
264
Fiber Clip
264
Routing with Rack Extension (1 Subrack)
264
Routing with Rack Extension (2 Subracks)
264
Routing Without Rack Extension (1 Subrack)
264
Routing Without Rack Extension (2 Subracks)
264
General Fiber Management
265
Side Cover Plate Mounting Onto the Rack Frame
274
Side Cover Plate Mounting Onto the Rack Extension
275
Installing the Rack Doors
277
Opening the Rack Doors
278
Installing the Door Lock
279
Power, Software and Circuit Pack Installation
281
PI/100 Switching
284
Breaker-Less" Pis (PI/100 NOCB)
287
Fan Unit Leds
288
Rubber Air Flow Baffles
289
Available Circuit Packs
313
Available Interface Modules
315
Blank Front Plate (3N) - CC848782868
317
Blank Front Plate (3N) with Empty Holes - CC848840112
318
Blank Front Plate (6N) - CC848782876
319
Slot Positions of the Circuit Packs
320
EP51 Slot Assignment
322
Association between EP51 Slots and ECI51 Slots
323
EP51/ECI51 Slot Association
324
Association between EP51 Slots and ECI51 Protection Groups
325
ECI51 Protection Group Assignment
326
LXC Configuration Rules with XC160
327
LXC Configuration Rules with XC320
329
LXC Configuration Rules with XC640
330
Undamaged Connector Blocks
334
Undamaged/Damaged EMI Shields
334
Undamaged Guide Headers
336
Part II: NE Provisioning and Stand-Alone Installation Test
347
7 NE Provisioning
348
Section 2
349
NE Provisioning
349
NE Login
350
Direct LAN Access (Point-To-Point)
351
Wavestar ® CIT LAN Access (Network)
352
Connecting the Wavestar CIT to the NE
354
Procedure 7-1: NE Login Via OSI
355
Procedure 7-2: NE Login Via TCP/IP
359
Provisioning System Parameters
361
Procedure 7-3: Changing the NE Name (TID)
362
Procedure 7-4: System Parameters
364
Screen of the Settings Tab
369
Elements of the Settings Tab
370
Procedure 7-5: LAN Port Configuration for TCP/IP Access
371
Procedure 7-6: NE Password Aging
378
Date and Time Screen
380
Procedure 7-7: NE Date and Time
380
Elements of the Date and Time Screen
381
Procedure 7-8: Mounting the CTL Protection Unit
383
Procedure 7-9: External Timing References
384
Procedure 7-10: System Timing
387
System Timing Screen
390
Procedure 7-11: External Timing Inputs
391
Section 3
395
Procedure 8-1: LED Test
396
8 Stand-Alone Test Procedures
397
Procedure 8-2: Alarm Reporting Tests
397
Procedure 8-3: NE Synchronization Test
402
Procedure 8-4: Optical Power Meter Test
405
Mean Launched Power Ranges
406
Procedure 8-5: Receiver Sensitivity Test
410
Receiver Sensitivity
416
Procedure 8-6: DS3 Transmission and Protection Test
418
Procedure 8-7: Optical Port Transmission Test (Daisy Chain Test)
426
Daisy Chain Test
428
Procedure 8-8: XC and CTL Protection Test
432
XC and CTL Protection Test
434
Part III: Network Establishment and Testing
445
Part III: Network Establishment and Testing
446
10 Network Establishment And10 Testing
447
Network Establishment
449
Procedure 10-1: Connecting the Fiber Cables
450
Protected Ring Configuration
452
Power Input Ranges of the Optical Circuit Packs
454
Build-Out Block with LC LBO
456
Shuttered LC LBO
456
Allwave LC and SC Attenuators
457
Procedure 10-2: Provision DCC
458
Procedure 10-3: Wavestar
461
Remote Login Test Via DCC
462
Procedure 10-4: Line Timing Test Setup
464
Line Timing Test Setup
465
Procedure 10-5: 1+1 MSP/APS Test Setup
469
Procedure 10-6: 2-Fiber MS-Spring/Blsr Test Setup
475
Procedure 10-7: 4-Fiber MS-Spring/Blsr Test Setup
482
Procedure 10-8: SNCP/UPSR Test Setup
489
SNCP/UPSR Test Setup
491
Test Procedures
497
Procedure 10-9: Line Timing Test
497
Procedure 10-10: 1+1 MSP/APS Test
500
Procedure 10-11: 2-Fiber MS-Spring/Blsr Test
505
Procedure 10-12: 4-Fiber MS-Spring/Blsr Test
511
Procedure 10-13: SNCP/UPSR Test
517
ONNS Test Setup
539
Appendix A: Installation Troubleshooting
553
Procedure A-1: Power Failure
554
Procedure A-2: Fan Unit Test Failure
556
Procedure A-3: NE Synchronization Failure
558
Procedure A-4: CTL Failure
560
Procedure A-5: CTL Protection Test Failure
562
Procedure A-6: XC Protection Test Failure
563
Procedure A-7: Circuit Pack Alarm Handling
564
User Panel Cable (UPL
566
Procedure A-8: LED Test Failure
566
User Panel Screws
567
Procedure A-9: Remote Login Failure
568
Procedure A-10: Alarm Handling
571
Procedure A-11: Switching off an NE
572
Procedure A-12: Fiber Cleaning
573
Procedure A-13: Replacing LC-Type Lbos
576
Installation Troubleshooting
577
Procedure A-14: Removing the SFP Modules
577
Unlocking a MSA Latch (Type 1) SFP
578
Unlocking a MSA Latch (Type 2) SFP
579
Unlocking a Bail Latch (Type 1) SFP
580
Unlocking a Bail Latch (Type 2) SFP
581
Passive WDM (OEM Equipment)
583
Passive WDM (OEM Equipment)
584
DWDM/CWDM Specifications
585
Mounting the DWDM
588
CWDM Carrier with Label
590
Optical-Channel Allocations
591
Front Panel
591
DWDM Cable Routing
593
DCM (OEM Equipment)
596
Mounting the DCM Carrier
596
Arrangements of the DCM Pack Positions
597
Cable Routing for the DCM Carrier
598
DCM Cpls
599
Stg Cpl
600
Fiber Storage Method
601
Mixed Configuration: 1675 Lambdaunite MSS and 1663 Admu
603
Procedure D-1: Mounting the 1663 Admu PDP
605
Fixing the 1663 Admu PDP
606
Mounted PDP
606
Procedure D-2: Mounting the 1663 Admu Subrack(S
607
Procedure D-3: Mounting a Fan Unit
609
Fan Unit Mounting
610
Airguide Mounting
611
Procedure D-4: Mounting the Airguide
611
Procedure D-5: Mounting the 1675 Lambdaunite MSS Subrack
612
Circuit Breaker Mounting
615
Procedure D-6: Mounting the Circuit Breakers
615
Fixing the Anti-Recirculation Plate
616
Mounted Anti-Recirculation Plate
616
Procedure D-7: Mounting the Anti-Recirculation Plate
616
Alcatel-Lucent - Proprietary
616
Mounting Positions (1675 Lambdaunite MSS and 1663 Admu
617
Mixed Configuration: 1675 Lambdaunite MSS and 1665 DMX (High Capacity)
619
Mounting the Subrack Guides
620
Mounting the Subrack
622
Mounting the Heat Baffle
623
Mounting the Anti-Recirculation Plate
626
Mounting Positions (1675 Lambdaunite MSS and 1665 DMX
627
Advertisement
Advertisement
Related Products
Alcatel-Lucent 1671 Service Connect
Alcatel-Lucent LambdaUnite 1675
Alcatel-Lucent 1850 TSS-100
Alcatel-Lucent OmniSwitch 10K
Alcatel-Lucent 1830 PSS-16
Alcatel-Lucent 1830 PSS-32
Alcatel-Lucent 1830 PSS-4
Alcatel-Lucent 1830
Alcatel-Lucent 1850 TSS-60
Alcatel-Lucent 1850
Alcatel Lucent Categories
Switch
Telephone
Network Router
IP Phone
Network Hardware
More Alcatel Lucent Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL