Part II: "Stand-alone installation testing"
Part II covers Chapters 5 and 6. These sections cover the initial Graphical User Interface
(GUI) or Craft Interface Terminal (CIT) software installation and turn-up testing on a new
Alcatel-Lucent 1850 TSS-60 shelf. It is intended to verify correct electrical DS1/DS3/FE
cable wiring to the DSX panel or punch down block as well SONET fiber routing to the
LGX panel from the faceplates of installed packs. This section also the recommended
checklist
Transport Service Switch 60 (TSS-60) system. Use of the installation checklist is required
to ensure a quality installation. All completed tasks should be checked off and those not
completed should be duly noted as to the reason why. This checklist should be turned in as
part of your job complete paperwork.
Chapter 5, "Stand-alone node setup"
This chapter provides procedures for initial Graphical User Interface (GUI) or Craft
Interface Terminal (CIT) software installation and circuit packs provided via work order.
Also, the use of the Graphical User Interface (GUI) or Craft Interface Terminal (CIT).
Chapter 6, "Stand-alone installation testing"
This chapter is to verify proper transmission cabling installation and Release 2.0
functionality as well as the associated functionality of the Alcatel-Lucent 1850 TSS-60
shelf.
Part III: "Network turn-up and testing"
Part III covers fiber connections between nodes in a ring. It is not intended to replace
acceptance test procedures. This section also provides the recommended checklist
"Installation checklist"
Use of the installation checklist is required to ensure a quality installation. All completed
tasks should be checked off and those not completed should be duly noted as to the reason
why. This checklist should be turned in as part of your job complete paperwork.
Chapter 7, "Connecting adjacent network elements"
This chapter is used to make fiber connections between nodes in a ring. It is not intended
to replace acceptance test procedures.
Part IV: "Miscellaneous detailed installation procedure and reference material"
Part IV provides supplementary information that is useful when installing the
Alcatel-Lucent 1850 TSS-60 system and using this Installation Manual.
............................................................................................................................................................................................................................................................
365-372-603R2.0
Issue 1 January 2009
"Installation checklist"
to follow when installing a Alcatel-Lucent 1850 TSS-60 system.
to follow when installing a Alcatel-Lucent 1850
x i i i

Advertisement

Table of Contents
loading

Table of Contents