Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 46

Transport service switch
Table of Contents

Advertisement

Physical and power installation
............................................................................................................................................................................................................................................................
Section and chapter
Notes:
1. Only required if equipped.
............................................................................................................................................................................................................................................................
I- 8
Procedure
"LNW74 (10/100-PL) and LNW66 (10/100T)
installation (optional)" (p. 4-24)
"LNW63 (GBE PL) 4 port or LNW64 (GBE
PL) 8-port installation (optional)" (p. 4-25)
"LNW70 and LNW170 (GigE/FE)" (p. 4-26)
"LNW78 (4 GIGE ports and 4 Optical 100
BaseLX -RPR)" (p. 4-27)
"LNW73/73C (4-fiber channel
FICON/ESCON) installation (optional)"
(p. 4-29)
"177D, LNW98 (Apparatus Blank) installation
(optional)" (p. 4-29)
"LNW43, LNW96 (apparatus blank)
installation (optional)" (p. 4-30)
"LNW42, LNW95 apparatus blank installation
(optional)" (p. 4-31)
Completed
Required
Yes
No
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
See Note 1
365-372-603R2.0
Issue 1 January 2009

Advertisement

Table of Contents
loading

Table of Contents