Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 136

Transport service switch
Table of Contents

Advertisement

Cable and fiber installation
............................................................................................................................................................................................................................................................
Procedure
Proceed as follows:
........................................................................................................................................................................................................................
1
Refer to the engineering job specification. Determine the function slot where the pack will
be inserted. The OC-3/OC-12/OC-48 pack can be inserted into either the D or G function
slots.
........................................................................................................................................................................................................................
2
Label the optical fiber cables, indicating bay, shelf, function group, pack, and direction
(IN or OUT).
........................................................................................................................................................................................................................
3
Route optical fiber cables from the interconnecting equipment into the left side of the
Alcatel-Lucent 1850 TSS-60 and into the OC-3/OC-12/OC-48 optical ports. See
Figure 3-19, "Optical fiber routing" (p.
........................................................................................................................................................................................................................
4
Place the optical fiber cables in a protective tube or channel.
........................................................................................................................................................................................................................
5
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
3 - 7 0
S
F
T E P S
OC-3/OC-12/OC-48 low-speed optical fiber cable
3-67).
"Installation checklist" (p.
installation
I-6).
365-372-603R2.0
Issue 1 January 2009

Advertisement

Table of Contents
loading

Table of Contents