Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 39

Transport service switch
Table of Contents

Advertisement

Part I: Physical and power
installation
Overview
Introduction
Part I covers the physical mounting of the Alcatel-Lucent 1850 Transport Service Switch
60 (TSS-60) shelf using the Horizontal Bay Mount. This section includes the running and
connecting of power cables, interconnecting cables, alarm cables, and as required, external
timing and communication cables. This section also covers initial circuit pack installation
(not seated).
Part I also provides the recommended checklist
installing a Alcatel-Lucent 1850 TSS-60 system. Use of the installation checklist is
required to ensure a quality installation. All completed tasks should be checked off and
those not completed should be duly noted as to the reason why. This checklist should be
turned in as part of your job complete paperwork.
Note:
additional fan shelf since the fan unit is integral to the shelf itself.
Contents
This part includes the following chapters:
Physical installation
Cable and fiber installation
Circuit pack installation
Tools, test equipment, and accessories
This section lists the tools, test equipment and accessories needed to perform all the
procedures in this installation manual.
............................................................................................................................................................................................................................................................
365-372-603R2.0
Issue 1 January 2009
The Alcatel-Lucent 1850 TSS-60 shelf does not require the installation of an
"Installation checklist"
to follow when
Chapter 2
Chapter 3
Chapter 4
I- 1

Advertisement

Table of Contents
loading

Table of Contents