Stand-alone installation testing
............................................................................................................................................................................................................................................................
Final operations
Description
The following procedure ensures that all test signals and cross-connects have been
removed and the Alcatel-Lucent 1850 TSS-60 shelf is alarm free and ready for network
connection procedures.
Procedure
Proceed as follows:
........................................................................................................................................................................................................................
1
Use the
........................................................................................................................................................................................................................
2
Verify that no alarm LEDs are lit and no FAULT LED is lit on any circuit pack.
If any alarm is present, refer to Alcatel-Lucent 1850 Transport Service Switch (TSS-60),
Release 2.0 Maintenance and Trouble-Clearing Guide — 365-372-602R2.0.
........................................................................................................................................................................................................................
3
If desired, reconnect the office alarm cable at this time.
........................................................................................................................................................................................................................
4
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
365-372-603R2.0
Issue 1 January 2009
GUI
to View and Delete any cross-connects that were entered.
S
F
T E P S
"Installation checklist" (p.
Final operations
II-5).
6 - 6 5