Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 154

Transport service switch
Table of Contents

Advertisement

Circuit pack installation
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
3
Place the main OLIU circuit pack into the M1 slot on the Alcatel-Lucent 1850 TSS-60
shelf. Do NOT engage the circuit pack in the backplane connector.
........................................................................................................................................................................................................................
4
Remove the second main OLIU from the packing material.
........................................................................................................................................................................................................................
5
Identify the M2 slot on the Alcatel-Lucent 1850 TSS-60 shelf. See
"Alcatel-Lucent 1850 TSS-60 shelf" (p.
........................................................................................................................................................................................................................
Place the second main OLIU circuit pack into the M2 slot on the Alcatel-Lucent 1850
6
TSS-60 shelf. Do NOT engage the circuit pack in the backplane connector.
Important!
LNW95 apparatus blank to provide proper air flow for cooling. For LNW140, LNW141 or
LNW84 main OLIUs the center divider must be removed and in the unused slot a LNW98
apparatus blanks installed to provide proper air flow for cooling.
........................................................................................................................................................................................................................
7
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
LNW39/LNW391 (DS1/DS3/16/3), LNW111 (3DS3) and LNW112 (16DS1) installation (optional)
Follow this procedure only if installing LNW39/LNW391 (DS1/DS3/16/3), LNW111
(3DS3) or LNW112 (16DS1) circuit packs into the Alcatel-Lucent 1850 TSS-60 shelf.
Note:
LNW140 main OLIU and LNW141 or LNW84 VLF main OLIU is used.
........................................................................................................................................................................................................................
1
Refer to the engineering job specification. Identify the proper function group slots where
LNW39, LNW391, LNW111 or LNW112 circuit pack will be installed.
........................................................................................................................................................................................................................
2
Remove the LNW39, LNW391, LNW111 or LNW112 from the packing material.
............................................................................................................................................................................................................................................................
4 - 1 2
If any of the main slots are to remain unequipped, install a LNW42 or
S
F
T E P S
The LNW39, LNW391, LNW111 and LNW112 are not supported when the
4-9).
"Installation checklist" (p.
Initial circuit pack installation
Figure 4-2,
I-6).
365-372-603R2.0
Issue 1 January 2009

Advertisement

Table of Contents
loading

Table of Contents