Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 264

Transport service switch
Table of Contents

Advertisement

Network turn-up and testing
............................................................................................................................................................................................................................................................
Installation checklist
Section and chapter
Part III: "Network turn-up and testing"
Chapter 7, "Connecting
adjacent network elements"
Chapter 8, "WDMX setup
and testing: integration
procedures"
Notes:
1. Only required if equipped.
............................................................................................................................................................................................................................................................
II I- 4
Procedure
"Fiber installation" (p. 7-4)
"Optical transmission test (OC-192, OC-48,
OC-12, OC-3)" (p. 7-11)
"Automatic protection switching test" (p. 7-13)
"Manual switching tests" (p. 7-15)
"Final operations" (p. 7-18)
"Turn-up and test the LNW785 8 channel
OMD" (p. 8-4)
"Connecting the ring (Mains) to the WDMX"
(p. 8-6)
"Removing provisioning and equipage from the
LNW785" (p. 8-9)
Completed
Required
Yes
No
Yes
See Note 1
See Note 1
Yes
See Note 1
See Note 1
See Note 1
365-372-603R2.0
Issue 1 January 2009

Advertisement

Table of Contents
loading

Table of Contents