Alcatel-Lucent 1850 TSS-60 Installation And System Turn-Up Manual page 64

Transport service switch
Table of Contents

Advertisement

Physical installation
............................................................................................................................................................................................................................................................
Note:
........................................................................................................................................................................................................................
3
Splice feeders from the BDCBB or BDFB to the Alcatel-Lucent 1850 TSS-60 power
cable. Refer to
follows;
Note:
1. BAT A
2. BAT A RTN
3. BAT B
4. BAT B RTN
Note:
arrangements and 15 amperes for a single shelf.
........................................................................................................................................................................................................................
4
Leave the BDCBB breakers off or BDFB fuses out until you are ready to perform the
procedures in
........................................................................................................................................................................................................................
5
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
2 - 1 8
The Alcatel-Lucent 1850 TSS-60 is powered by -48 V DC.
CAUTION
Verify that the BDCBB breakers are off or that the BDFB fuses are not installed.
Table 2-3, "Power connections" (p.
Four wires are spliced to the power cables.
Each feeder at the BDCBB or BDFB should be fused for 25 amperes for bay
Chapter 4, "Circuit pack installation"
S
F
T E P S
2-19). and should be labeled as
of this manual.
"Installation checklist" (p.
Power cable installation
I-6).
365-372-603R2.0
Issue 1 January 2009

Advertisement

Table of Contents
loading

Table of Contents