Settings For Otdr Tests - Fluke Versiv Series Technical Reference Handbook

Hide thumbs Also See for Versiv Series:
Table of Contents

Advertisement

Versiv Series Cabling Certification Product Family
Technical Reference Handbook
SET COMP: Lets you select a launch method and set the
lengths of launch and tail cords. See"About Launch and Tail
Cords" on page 320.
RESULTS: Tap RESULTS to see and manage the results that are
saved in the tester.
SYNC: To upload results to LinkWare Live, tap SYNC. See Chapter
18.
TEST: Tap TEST to do the test shown in the test setup panel.
% Tested: The percentage of the tests in the project that are
completed. The tester uses the number of available IDs and
the tests you selected on the CABLE ID SETUP screen to
calculate this percentage. See Figure 198 on page 526. %
Tested does not show if your project contains only a Next ID
list. See "To Make ID Sets with International Characters" on
page 550 for more information about the Next ID list.
The type of module attached to the tester.
The asset management icon shows when the owner of a
LinkWare Live account has enabled the asset management
service for the tester. See "About the Asset Management
Service" on page 566.

Settings for OTDR Tests

Table 12 gives descriptions of the settings for OTDR tests.
The Manual settings in Table 12 apply to these tests:
Manual OTDR
SmartLoop OTDR (Manual)
To set up a project, which includes the settings in Table 12, cable
IDs, and operator names, see Chapter 17.