Fluke Versiv Series Technical Reference Handbook page 347

Hide thumbs Also See for Versiv Series:
Table of Contents

Advertisement

To set up an OTDR test
On the home screen, tap the test setup panel.
1
On the CHANGE TEST screen, tap an OTDR test to change,
2
then tap EDIT.
Or to set up a new OTDR test, tap NEW TEST.
If no module is installed, the MODULE screen shows. Tap
the correct OptiFiber Pro module. Then on the TEST TYPE
screen, tap a test.
If the correct module does not show on the TEST SETUP
screen, tap Module, then on the MODULE screen tap the
correct OptiFiber Pro module.
On the TEST SETUP screen, tap the panels to change settings
3
for the test. See Table 12.
On the TEST SETUP screen, tap SAVE when your test setup is
4
completed.
On the CHANGE TEST screen, make sure the button next to
5
the test is selected, then tap USE SELECTED.
For all Test Types except FaultMap and
FiberInspector, you can use the SETUP button on the
TRACE screen to change some OTDR settings
manually after a test. See "How to Quickly Try
Different OTDR Settings" on page 366.
Chapter 11: The OptiFiber Pro OTDR Module
Note
Settings for OTDR Tests
311

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

VersivVersiv 2Dsx-8000Dsx-5000Cfp2-100-q-int

Table of Contents