Probe Conn Set Assy (Fru No. 513) - GE LOGIQ 500 Service Manual

Hide thumbs Also See for LOGIQ 500:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 14
6–2–65 Probe CONN Set Assy (FRU No. 513)
Time Required
40 Minutes
Tool Required
Screwdriver
Procedure
Refer to ILLUSTRATION 6–84 and ILLUSTRATION 6–85.
1.
Turn OFF the system.
2.
Remove the Front Base Cover (FRU 307). Refer to 6–2–26 on page 6–103.
3.
Remove the Front Cover (FRU 308). Refer to 6–2–27 on page 6–104.
4.
Remove the Side Cover Left (FRU 301). Refer to 6–2–20 on page 6–97.
5.
Remove the Keyboard Bottom Cover (FRU 309). Refer to 6–2–28 on page 6–106.
6.
Remove the HDD LED Assy (FRU 523). Refer to 6–2–72 on page 6–169.
The HDD LED Assy is not installed on the console with the new type of 3.5–inch HDD Assy (Quan-
tum FireBall 1280S or newer ).
When the customer uses the Single CWD option, the CWD2 Assy is installed on the case metal of the
Probe CONN Set Assy. Remove the CWD2 Assy from the Probe CONN Set Assy removed and re–
install it to the new Probe CONN Set Assy.
7.
Remove the Power Switch Assy (FRU 525). Refer to 6–2–73 on page 6–170.
The FRONT SHIELD is installed from production unit of LOGIQ500 console with software version
5.00 y or later. Refer to ILLUSTRATION 6–85 on page 6–157. Unscrew the four screws (
to remove the FRONT SHIELD and BLIND METAL PLATE.
Disconnect one connector ( 1 ).
8.
Disconnect four connectors ( 2 – 5 ).
9.
10. Loosen two screws ( 6 and 7 ).
11. Unscrew two screws ( 8 and 9 ).
12. Slightly lift the Probe CONN Set Assy up, move it leftwards, and remove it.
13. Unscrew two screws (
11
10
and
).
Note
Note
Note
6–156
LOGIQ 500 SERVICE MANUAL
P9030TA
13
10
and
)
RENEWAL PARTS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents