MX960 3D Universal Edge Router Hardware Guide
Removing the Standard Cable Manager Before Installing an MX960 Router with a Lift
206
Figure 55: Removing a Power Supply Before Installing the MX960 Router
To remove the standard cable manager (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Using a 7/16-in. (11 mm) nut driver, unscrew the nuts on the corners of the standard
2.
cable manager.
Grasp the bottom of the standard cable manager, and pull it straight out from the
3.
studs on the front of the chassis.
Figure 56 on page
207):
Copyright © 2017, Juniper Networks, Inc.