Completing The Scbe2 Upgrade - Juniper MX960 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Copyright © 2017, Juniper Networks, Inc.
If any of the status LEDs indicates that the power supply is not functioning normally,
repeat the installation and cabling procedures.
On the external management device connected to the Routing Engine, monitor the
9.
startup process to verify that the system has booted properly.
NOTE:
If the system is completely powered off when you power on the
power supply, the Routing Engine boots as the power supply completes
its startup sequence. Normally, the router boots from the Junos OS on the
CompactFlash card.
After turning on a power supply, wait at least 60 seconds before turning
it off.

Completing the SCBE2 Upgrade

To complete the SCBE2 upgrade procedure:
Verify that the installation is successful and the SCBE2 is online by issuing the
1.
chassis environment cb
user@host> show chassis environment cb 0
CB 0 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
user@host> show chassis environment cb 1
CB 1 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
Other details, such as, temperature, power, etc are also displayed along with the state.
Verify that the fabric planes come online correctly by issuing the
2.
command:
summary
user@host> show chassis fabric summary
Plane
State
Uptime
0
Online
2 days, 19 hours, 10 minutes, 9 seconds
1
Online
2 days, 19 hours, 10 minutes, 9 seconds
...
Verify that the backup Routing Engine is back online by issuing the
3.
command:
routing-engine 1
user@host> show chassis routing-engine 1
Routing Engine Status:
Slot 1:
Chapter 27: Replacing Switch Fabric Components
command:
show
show chassis fabric
show chassis
427

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx960 3d

Table of Contents