Install Starter Motor; Starter Solenoid Test - TOHATSU NB-1000 Service Manual

2 stroke 1&2 cylinder models
Table of Contents

Advertisement

SECTION 7

Install Starter Motor

1. Slide starter motor into bracket, apply threadlocker to
29
bolt threads, and instaII mounting bolts.
2. Connect starter solenoid cable and ground cable.
3. Coat terminals with battery spray protector.

Starter Solenoid Test

1. Disconnect terminals (4) and (5) and disconnect terminal
30
(3) from chassis ground.
2. Set analog multimeter for continuity. Check for continuity between
terminals:
(3) and (5). lf meter does not show continuity, replace starter
solenoid (1).
(5) and clean chassis ground. lf meter shows continuity, replace
starter solenoid.
(3) and clean chassis ground. lf meter shows continuity, replace
starter solenoid.
3. Disconnect positive battery lead (8) and RED starter switch lead
(9) from starter terminal (2) and disconnect starter motor lead (7)
from starter terminal (6).
4. Check for continuity between terminals:
(2) and (6). lf meter shows continuity, replace starter solenoid.
(2) and clean chassis ground. lf the meter shows continuity, replace
starter solenoid.
(6) and clean chassis ground. lf the meter shows continuity, replace
starter solenoid.
7-62
30
T1795
T1545
1-/ 2-Cylinder

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2 stroke cylinder series

Table of Contents