TOHATSU NB-1000 Service Manual page 34

2 stroke 1&2 cylinder models
Table of Contents

Advertisement

ltem
Inspection
Engine
• Check with
Compres-
compression
sion
gauge
Water
• Check for wear
Pump
and damage.
Cooling
Remove dirt and
and
deposits from
Exhaust
the following:
Compon-
• Water pump
ents
and impeller
• Water pipe
• Thermostat
• Exhaust cover
• Exhaust pipe
• Engine base
• Reverse gas
passage
Power
Inspect and remove
head
carbon deposits
Cleaning
from the following:
• Cylinder head
• Pistons
• Rings
• lnner exhaust cover
• Outer exhaust cover
EIectrical
• Check for loose
Wiring
connections
• Inspect wires and
insulation for
damage
Ignition
• Check and adjust
Timing
timing
and
• Adjust linkage.
Carburetor
Adjustment
Throttle
Inspect for the
and
following:
Choke
• Loose ball joints
Valve
and lock nuts
Linkage
• Bent link rods
• Loose rod snaps
1-/ 2-Cylinder
GENERAL SERVICE INFORMATION
After
Before
1st 10
Each
Hours
Use
2 Days
Every
Every
Every
50 Hrs
100 Hrs
30 Hrs
or
or
or
30
60
7 Days
Days
Days
Remarks
Obtain normal
operating
temperature and
check at full throttle.
Replace impeller
every 200 hours
(12 months).
Check every
200 hours
(12 months).
See Synchronization
and Linkage Adjust
ments in this section.
2-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2 stroke cylinder series

Table of Contents