TOHATSU NB-1000 Service Manual page 68

2 stroke 1&2 cylinder models
Table of Contents

Advertisement

2
1. Remove drain screw (4) from float chamber and allow to
3
drain.
2. Lift throttle lever (5) up. Unscrew cap (6) and remove
2
throttle assembly (7). If necessary, disassemble throttle
assembly.
3
3. Remove float chamber (8) and float (9).
3
4. Remove float valve assembly (10) and needle valve seat (11).
3
5. Remove main jet assembly (12).
3
6. Remove throttle stop screw assembly (13).
7. Remove and discard o-ring (14).
3
4
1-/ 2-Cylinder
3
T1126
FUEL SYSTEM
T2050
T1128
3-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2 stroke cylinder series

Table of Contents