Checking Control Strategy - Honeywell Series A User Manual

Fieldbus interface module
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

Stage
Making a fieldbus device type from vendor DD
25
Match device.
If you are running software version R210 or greater, a wizard is
provided to guide you through the steps for matching an
uncomisisioned device.
References:
Matching uncommissioned device to project device or vice versa
26
Load (Partial Load) the new device from Project tab.
References:
Loading Link contents or fieldbus device
27
Measure and compare H1 segment baseline with Fluke
Scopemeter and Relcom FTB-3 or equivalent equipment.
28
Are measurements within specifications?
NO > Go to Stage 29
YES > Go to Stage 30
29
Identify source of noise or communication problems and repair or
replace equipment as required.
Return to Stage 27
30
Do you need to add more devices on this segment?
NO > Go to Stage 31 in the next section Checking Control
Strategy.
YES > Return to Stage 8 in previous section Connecting
Devices.
7.4

Checking Control Strategy

Stage
31
Is control strategy configured?
NO > Go to Stage 32
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
July 2010
7. Fieldbus Device Commissioning
7.4. Checking Control Strategy
Funtion
Funtion
Honeywell
Completed
Completed
283

Advertisement

Table of Contents
loading

This manual is also suitable for:

Experion pks series a

Table of Contents