Checking Link Configuration - Honeywell Series A User Manual

Fieldbus interface module
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

Step
21
Go to the next section Checking link
configuration.

Checking link configuration

Use the following procedure to check the link configuration of the links associated with a
given CIOM-A FIM block. This procedure assumes that you have configured a CIOM-A
FIM block in the Project tab of Control Builder.
TIP
Like the CIOM-A FIM, you can configure a Link through the Project tab of
Control Builder without having the link installed. However, some
parameters on the Link configuration form can only be viewed through the
Monitoring tab with the FIM and Link installed and communicating with the
system.
Be sure to click the plus sign in front of the CIOM-A FIM icon to open its
directory tree and expose the Link icons. With Hierarchal Building license
option, must have Assignment View active.
If you are running Experion R210 or greater software, a wizard will guide
you though the Link configuration process. In this case, you can skip the
following procedure.
Step
TIP
With the LINK icon selected, you can also click Edit-> Module Properties to call up the
Link Block Parameters configuration form.
1
Right-click the Link icon
Module Properties from the list.
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
July 2010
5.4. Configuring Fieldbus Components In a Control Strategy
Action
Action
and select
Honeywell
Result
Result
Calls up the Link Block Parameters
configuration form with the Name field
highlighted.
5. Configuration
133

Advertisement

Table of Contents
loading

This manual is also suitable for:

Experion pks series a

Table of Contents