Mounting On A Din Rail - Honeywell Series A User Manual

Fieldbus interface module
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

4. Installation
4.3. Installing Fieldbus RTP TC-FFRU01/TC-FFRP02 or RRTP TC-FFSU01/TC-FFSP02
Figure 17 Redundant RTP model TC-FFSU01 is unpowered and can be
used in Division 2 hazardous locations; model TC-FFSP02 is powered and
can be used to power fieldbus devices in Intrinsically Safe applications.

Mounting on a DIN rail

ATTENTION
You are responsible for obtaining and mounting the 35 x 7.5 mm metal,
top hat rails (DIN EN50022) to be used for mounting the Remote
Termination Panel (RTP).
We recommend that you mount the RTP in an enclosure.
Use the following procedure to mount the RTP on the user supplied DIN rail.
Step
1
Orient the RTP so the top of the unit is over the top of the DIN rail.
2
Slightly rotate the RTP to slip its top mounting flange on the top of the DIN
110
Experion PKS Series A Fieldbus Interface Module User's Guide
FB+
SHLD
FB-
SHLD
FB+
FB-
FB+
SHLD
FB-
SHLD
FB+
FB-
-
-
-
+
+
+
+
J9 J10 J11 J12
Action
Honeywell
RTP CABLE
RTP CABLE
-
R400
July 2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Experion pks series a

Table of Contents