Appendix H; 17.1 Important Functional Considerations; General - Honeywell Series A User Manual

Fieldbus interface module
Hide thumbs Also See for Series A:
Table of Contents

Advertisement

17.1 Important Functional Considerations

The following tables lists some functional considerations to keep in mind when
integrating fieldbus with an Experion system.

General

Function
Fieldbus device with
previous address
assignment is added
to a Link. .
Adding Link Master
capable device to
operating Link.
Link Slot Time setting
is 8 or less.
Using automatic
inactivate/activate
function in Load
Dialog box in Control
Builder
Fieldbus device
designated as
"backup" Link Master
cannot handle the
Link Schedule. (Also,
see the next row.)
R400
Experion PKS Series A Fieldbus Interface Module User's Guide
July 2010

17. Appendix H

Indication
Potential to lose Link
Schedule, if FIM fails
before "uncommissioned"
device is "commissioned".
Potential for LM capable
device to assume LAS role
using empty or incorrect
Link Schedule.
A new uncommissioned
device may not appear in
the Link directory in the
Monitoring tab.
A component is
automatically inactivated
during the load and then
returned to its active state.
Device icon turns yellow
(LM without schedule) or
red (bad communications).
Honeywell
Consideration
Always remove the address from a
used fieldbus device before you store
it.
See the
Guidelines for adding fieldbus
device to "live"/operating Link
Maintenance, Checkout, and
Calibration section of this document.
Change the default Slot Time setting to
10 on the Link Block Parameters form
in Control Builder.
(If an uncommissioned device does not
appear, try increasing the Slot Time
value by one and cycling power to the
FIM. Repeat this action, as required.)
Do not use this automatic
inactivate/activate function, if your
process cannot tolerate the load
disruption and consequent delay in
activation.
The FIM is the primary Link Master for
both Links. If you designate a device
as a "backup" Link Master, be sure it
has the capacity to handle the Link
Schedule. Otherwise, you may have to
reconfigure the device as a Basic type
and restart it to initiate the change, if
the Link Schedule is too large for it to
handle.
in the
533

Advertisement

Table of Contents
loading

This manual is also suitable for:

Experion pks series a

Table of Contents