Installing A Brocade Netiron Xmr 32000 Router; Preparing The Installation Site; Unpacking A Brocade Netiron Xmr 32000 Router - Brocade Communications Systems MLX Series Installation Manual

Mlx series, netlron xmr series
Hide thumbs Also See for MLX Series:
Table of Contents

Advertisement

Installing a Brocade NetIron XMR 32000 router

This section describes how to install a Brocade NetIron XMR 32000 router:

Preparing the installation site

Before installing the router, plan the location and orientation relative to other devices and
equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,
and the back of the router and walls or other obstructions. If a router is installed within a perforated
enclosure, the perforations must cover at least 60 percent of the surface.
Since you will be using a mechanical lift to move and install the router, make sure you allow enough
working room.
NOTE
Make sure your site provides 200-240 AC power.
Ensure that the proper network and power cabling is installed in the site. For information on
cabling, refer to
Brocade NetIron XMR 32000 router power supplies"
station"

Unpacking a Brocade NetIron XMR 32000 router

The Brocade NetIron XMR 32000 router ships with the following items:
If any items are missing, contact the place of purchase
Removing the Brocade NetIron XMR 32000 from the shipping crate
The Brocade NetIron XMR 32000 router ships in a wooden crate, bolted to an inner pallet, and
resting on an outer pallet. To remove the router, the crate must be in the upright (vertical) position.
Before unpacking the router, the site should be prepared as described in
site"
Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide
53-1002373-02
"Brocade NetIron XMR 32000 cable management"
on page 296.
Router chassis with the card slots empty, and covered with upper and lower shipping panels
The appropriate number of interface modules, switch fabric modules, management modules,
and power supplies
A total of 32 slot blanks
Insertion or extraction tool for use with RJ 45 and fiber-optic connectors
on page 273. You will need these tools:
A forklift or pallet jack with a minimum weight limit of 550 lb to move the router while still on
the pallet.
A mechanical lift with a minimum weight limit of 350-lb limit to move the router off the pallet.
The ideal configuration is a counterweight base material lift with a metal lift plate installed in
place of the forks. The metal plate should be no wider than 17 inches, so that it will fit between
the rack mount rails.
A strap to stabilize the router while it is being moved on the mechanical lift
A power drill
A large Phillips screwdriver attachment
Installing a Brocade NetIron XMR 32000 router
on page 290, and
on page 280,
"Installing
"Attaching a management
"Preparing the installation
4
273

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents