Brocade Communications Systems MLX Series Installation Manual page 300

Mlx series, netlron xmr series
Hide thumbs Also See for MLX Series:
Table of Contents

Advertisement

4
Installing a Brocade NetIron XMR 32000 router
Cable routing for the upper-left quadrant
Route cabling from slots in numerical order starting with the cables for slot #1.
1. Route cables for slots #1 and #2 directly to the left through the side comb. Refer to
FIGURE 196
1
2
282
Routing upper-left quadrant cables
1
3
4
Upper left quadrant
Side combs (18)
2
3
Cables from slot #1
4
Cables from slot #2
Brocade MLX Series and NetIron XMR Hardware Installation Guide
Figure
196.
53-1002373-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents