Brocade Communications Systems MLX Series Installation Manual page 288

Mlx series, netlron xmr series
Hide thumbs Also See for MLX Series:
Table of Contents

Advertisement

4
Installing a Brocade NetIron XMR 16000 router
Connecting AC power
AC power is supplied through a power cord connected to the power supply installed in the Brocade
NetIron XMR 16000 router.
Follow these steps to connect the AC power source.
NOTE
For the NEBS-compliant installation, AC power connections must use a surge protection device
(SPD) to protect AC power supplies from damage due to excessive power line surges.
1. Locate the power receptacles in the power supplies on the back panel.
2. Lift the cord retainer and connect an AC power cord to each power supply.
3. Snap the cord retainer over the power plug to hold it in place.
FIGURE 188
1
2
For information about powering on the system, refer to
270
Connecting a power cord to the power supply in a Brocade NetIron XMR 16000 router
5
Lift handle
3
Cord retainer
5
4
Power cord
5
Ground point
"Activating the power source"
Brocade MLX Series and NetIron XMR Hardware Installation Guide
1
2
3
Lift handles
on page 297.
53-1002373-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents