Fujitsu SPARC Enterprise M4000 User Manual page 332

Fujitsu server user's guide
Hide thumbs Also See for SPARC Enterprise M4000:
Table of Contents

Advertisement

Event
SCF Reset:
Domain Power ON:
Domain Power OFF:
System Power ON:
System Power OFF:
XIR:
Domain Reset:
Factor by which the power event was instructed (Cause). The causes and their
meanings are as follows:
Cause
Self Reset:
Power On:
System Reset:
Panel:
Scheduled:
RCI:
AC Restored:
Operator:
Poweron Restart:
Power Failure:
SW Request:
Alarm:
Fatal:
Panic:
Domain ID for power event (DID)
Mode switch status on the operator panel (Switch). The following lists the
switches and their meanings:
B-6
SPARC Enterprise Mx000 Servers XSCF User's Guide • April 2008
Meaning
The XSCF was reset.
The domain power supply was turned on.
The domain power supply was turned off.
The power supply of the server common section was turned on.
The power supply of the server common section was turned off.
The XIR was reset.
The domain was reset.
Meaning
Self-resetting of the XSCF reset the XSCF.
Turning on the input power supply reset the XSCF.
The detection of an error reset the XSCF.
Operating a switch on the operator panel caused a power event.
Setting the TOD timer caused a power event.
The ID device connected to the RCI caused a power event.
Power recovery turned on the power supply.
An operator's instruction caused a power event.
Retrying power on operation turned on the power supply.
A power interruption cut off the power supply.
An OS instruction caused a power event.
The server environment or a hardware fault caused a power event.
Fatal caused a power event.
Panic caused a power event.

Advertisement

Table of Contents
loading

Table of Contents