Disk Array Installation/Troubleshooting Checklist
The following checklist is intended to help isolate and solve problems that may occur when
installing the disk array.
•
Check for Physical Damage:
– Disk array packaging and disk array components undamaged
– Cabinet packaging and cabinet undamaged
•
Check Site Power
– Proper use of ground and neutral with correct gauge wire
– Neutral to ground voltage less than 3 volts
– Ground connected to main service panel with correct gauge wire
– Raised floor properly grounded
– No single wire daisy chaining of ground between power receptacles
– Power source used exclusively by computer room
– No power surges or sags
– Proper voltage on all phases
– Other (RFI/EMI)
•
Check Site Environment:
– Ambient temperature within specifications (20° C to 25.5° C (68° F to 78° F))
– Perforated tiles properly placed to enhance proper airflow
– No temperature hot spots within computer room
– Humidity within specifications (40% to 60% non-condensing)
– Proper clearance between surrounding products
Disk Array Installation/Troubleshooting Checklist
211