Operation Check
Signal names
Red: Conditions met
Blue: Conditions not met
282
2. Select Start from the Validate Action Menu. The Action Validation Screen
will be displayed as shown below. The cursor will change to the
the Loop Controller is not operating, Sequence Table (Monitoring): Stopped
will be displayed.
3. Select Operation and then Run/Stop Command from the Execute Menu
and implement a cold start or a hot start The display will change to Sequence
Table (Monitoring) and the sequence table execution status will be dis-
played. The colors displayed on the screen can be used to check the actions
of the sequence table.
Conditions
Set numbers
Red: Current step (indicated with red dot)
Blue: Other status
Actions
Signal names
Orange with ": 1": Actions being executed every cycle for output 1
Orange with ": 0": Actions being executed every cycle for output 0
Red with ": 1": Actions not being executed every cycle for output 1
Red with ": 0": Actions not being executed every cycle for output 0
Note ITEMs can be written during sequence table validation to check the operation of
the sequence table. As shown below, change the value of the ITEM serving as
Section
Rule numbers
Red: Conditions met
Blue: Conditions not met
The value area for the
current step is displayed
in cream.