Installing an energy pack

Installing an energy pack
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Remove the access panel .
7. Install the energy pack.
CAUTION:
CAUTION:
To prevent improper airflow that can lead to thermal damage, make sure to secure the energy pack cable in the
metal tab as shown in the cabling illustration.
8. Connect the energy pack cable .
9. Connect the storage controller backup power cable .
10. Install the access panel .
11. Install the server into the rack .
12. Connect all peripheral cables to the server.
13. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
14. Power up the server .
15. If removed, install the front bezel .
Installing an energy pack
135