Installing The New Solenoid - Ametek 5830 User Manual

Moisture analyzer
Hide thumbs Also See for 5830:
Table of Contents

Advertisement

Installing the New Solenoid

1. Carefully, mount the new solenoid valve on the valve manifold using the
2. If you are replacing one of the three-way valves, reconnect the 1/16-inch
3. Place the sample manifold plate back in the Oven and secure with the four
4. Reconnect all four (4) 1/16 fittings on the bracket in the center of the Oven
5. Replace the Sample Oven Cover and secure it with the two (2) nuts (Figure
6. Replace the Analyzer Cover and secure it with the mounting screws.
Figure 4-7.2.
5830 solenoid replacement.
4-14 | 5830 Moisture Analyzer
two (2) flat-head screws. Ensure that both O-ring seals are properly seated.
fitting to the appropriate port on the exhaust manifold.
(4) mounting screws.
(Figure 4-2).
4-1).
Pr oport i onal
Solenoid Valve
Ele ctr i cal
C onnect ion
6/ 32 Fla t H ead
Scr ew ( 2)
3-Way
Solenoid Valve
2-Way
Solenoid Valve
O - Rin g Seal ( 2)
3-Way
Solenoid Valve
Fla t Washer ( 2)
Lock Washer ( 2)
PN 583054901, Rev YA
3-Way
Solenoid Va

Advertisement

Table of Contents
loading

This manual is also suitable for:

583054901

Table of Contents