5. Using two (2) of the dryer mounting screws, secure the dryer in the top
6. Working quickly, install a new 1/8-inch VCR gasket in both of the fittings,
7. Tighten the nut an additional 1/8 turn.
8. Repeat Steps 4 through 7 for the second dryer, which you will mount in the
9. Replace the Dryer Compartment Cover.
10. The production codes for the dryers supplied with the analyzers have been
Dryer M ount ing S cre w s
Figure 2-4.2.
Inside dryer compartment.
PN 583054901, Rev YA
(Sample System Dryer) position (Figure 2-4.2).
and tighten the two (2) VCR nuts over the fittings until they are finger tight.
bottom (Zero Dryer) position (Figure 2-4.2).
entered at the factory, so there is no need to enter them during an initial
startup of the analyzer. For all subsequent replacements/installations of
dryers, you will need to enter a production code for the Reference Dryer
(see details in the Variables table in Chapter 2, and refer to "Production
Codes" and "Working From the Schedule Tab" in Chapter 3).
Sample System
Dryer
Zer o Dryer
Installation and Start-Up
|
2-11