Dryers
Removing the Dryers
1. At the rear of the analyzer, locate the dryer compartment on the right-
2. Use a #2 Phillips screwdriver to loosen the four (4) captured screws on the
3. Remove the Analyzer Cover.
4. The Sample System (Reference) dryer is located in the top position, and the
5. Taking one (1) dryer at a time, use a 7/64-inch hex wrench to remove the
6. Loosen the 1/8-inch VCR fittings on the dryer and remove the dryer from
Dryer Compartment
Cover
Figure 4-8.
5830 dryers.
PN 583054901, Rev YA
hand side (Figure 4-8).
Dryer Compartment Cover.
Zero Dryer is located in the bottom position.
mounting screws that pass through the top of the dryer body and set
them aside.
the analyzer. Discard the used VCR gaskets from the fittings.
Samp l e System Dryer
( top dryer )
1/8" VC R G asket
(2 ea dryer )
Maintenance and Troubleshooting | 4-15
Zero Dr yer
( bottom dryer )
Dryer M ount i ng Scre w s
(2 ea ch)