Page 358 of 488
553-3041-210
Standard 4.00
Installing the Main Distribution Frame
Procedure 90 describes how to install the Krone Test Jack Frame for the UK.
For detailed information, refer to the Krone documentation.
Procedure 90
Installing the Krone Test Jack Frame (UK)
1
Refer to the equipment layout plan to determine where to place the
cross-connect terminal.
2
Lay out the terminal blocks as shown in Figure 124 on
3
Attach labels on the cross-connect terminal to indicate the terminal blocks
assigned to the following:
•
Analog Line cards
•
DC15/AC15/RAN/PAG cards
•
Data Access cards
•
AUX wiring
•
Power Fail Transfer Units
•
Digital Line cards
•
Telephones
•
Exchange Line Trunk cards
•
Direct Dialing Inward trunk cards
•
Miscellaneous equipment
September 2007
page
359.