Nortel 1000E Installation And Configuration Manual page 149

Nortel 1000e server: install guide
Hide thumbs Also See for 1000E:
Table of Contents

Advertisement

7
Check applications (CallPilot, Symposium, and so on)
Switch call processing
Procedure 30
Switching call processing
LD 135
SCPU
Call Server 0 is now the active call processor.
Procedure 31
Testing Call Server 1
From active Call Server 0, perform these tests on Call Server 1:
1
Perform a redundancy sanity test:
LD 135
STAT CPU
TEST CPU
2
Check the LCD states.
a.
Perform a visual check of the LCDs.
b.
Test LCDs:
LD 135
TEST LCDs
DSPL ALL
c.
Check that the LCD display matches the software check.
Communication Server 1000E
Installing software on the CS 1000E
End of Procedure
Load program
Switch call processing from Call Server 1
to Call Server 0
End of Procedure
Load program
Get status of CPU and memory
Test the CPU
Load program
Test LCDs
Page 149 of 488
Installation and Configuration

Advertisement

Table of Contents
loading

Table of Contents