Nortel 1000E Installation And Configuration Manual page 142

Nortel 1000e server: install guide
Hide thumbs Also See for 1000E:
Table of Contents

Advertisement

Page 142 of 488
Verifying Call Server 0 is active
Make the system redundant
553-3041-210
Standard 4.00
Installing software on the CS 1000E
Use the following commands to verify that Call Server 0 is active.
LD 135
STAT CPU
CFN
At this point, Core/Net 0 is ready to be synchronized with Core/Net 1.
Procedure 28
Making the system redundant
1
Check to see if the LAN 1 and LAN 2 cables are attached. If not, attach
the LAN 1 and LAN 2 cables to the CP PIV faceplate connectors on Call
Server 0 and Call Server 1.
2
Once the synchronization of memories and drives is complete, STAT the
CPU and verify that the CPUs are in a true redundant state.
LD 135
STAT CPU
****
September 2007
Load program
Get the status of the CPUs
Get status of CPU and memory
Exit the program

Advertisement

Table of Contents
loading

Table of Contents