Patient Monitor User Manual
Chapter 2 Installation
NOTE:
The monitor settings must be configured by the authorized hospital personnel.
2.1 Initial Inspection
Before unpacking, check the packaging and ensure that there are no signs of mishandling or
damage. If the shipping cartons are damaged, contact the carrier for compensation and package
them again.
Open the package carefully and remove the monitor and accessories. Check that the contents are
complete and that the correct options and accessories have been delivered.
If you have any question, please contact your local supplier.
2.2 Mounting the Monitor
Place the monitor on a flat, level surface, hang it on the bed rail, or mount it on a wall. For
detailed information about how to install the wall mount for the monitor, please refer to the Wall
Mounting Bracket Assembly Instruction.
1
The wall mounting bracket can be fixed only on a concrete wall.
2
The safe load of the wall mounting bracket is 20 kg. Exceeding the safe load may
cause bracket to fail and the device to fall.
2.3 Connecting the Power Cable
Before connecting the power cable, check if the fuse is well installed inside the connector. (Refer
to the illustration Rear View in the Section 3.1.1 and locate "AC power input".) The specification
of the fuse is T3.15 AH 250 VP.
Connection procedure of the AC power line is listed below:
1
Make sure the AC power supply complies with the following specifications: 100 V-240 V~,
50 Hz/60 Hz, 1.8 A to 0.75 A.
2
Connect the power cord provided with the monitor. Connect the power cord to connector of
the monitor. Connect the other end of the power cord to a grounded power outlet.
NOTE:
1
Connect the power cable to the socket specialized for hospital use.
2
Only use the power cable supplied by EDAN.
WARNING
- 12 -
Installation