Build Job Warnings - Stratasys FORTUS 360mc Manual

Hide thumbs Also See for FORTUS 360mc:
Table of Contents

Advertisement

4.
If
User Placement on Platen
following choices:
Note: For more information about User Placement on Platen
see
"Display Units" on
>Locate Part Start..
Demo Bounding Box
Continue..
A.
Select
change the part build start location.
B.
Select

Build Job Warnings

If the system detects an issue that may affect a job build, it displays one of the
following warnings:
1.
Head has been changed. Consider tip calibration
• Indicates a new head has been installed.
• Run and verify a calibration part before building jobs. See
Z Tip Offset - Manual Start" on
2.
Change Model (or Support) Canister to ABS
• Indicates a mis-match between loaded material and material for
which the part (CMB) file was processed.
• Replace the flagged material canister with proper type.
3.
Need More Model (or Support) Mat'l (9.1
• The total available material is less than the estimated amount for
the part (CMB file).
• If the system runs out of material before part completion, system
will pause the build until material is added.
• Replace flagged material canister.
4.
Need both (or 4 for 4-bay system) canisters present..
• Indicates that at least one operating canister bay does not have
material loaded to the Ready mode (flashing green LED)
• System operation will not be significantly compromised by this
condition. The air-dryer circuit performs more efficiently when all
operable bays are Ready.
• Install canisters to the Ready mode for all operating canister bays.
4-8
FORTUS 360mc/400mc and FDM 360mc/400mc User Guide
Demo Bounding Box
to initiate the part build.
Continue..
is set to
YES
page 4-30.
or
Locate Part Start
page 6-10.
, you are offered the
to view or
"XY and
(or other material)..
more)..

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortus 400mc

Table of Contents