BUILD JOB WARNINGS
If the system detects an issue that may affect a job build, the system displays one of the following warnings:
Figure 4-27:
Head has been changed. Consider tip calibration.
A.
•
Indicates a new head has been installed.
•
Run and verify a calibration part before building jobs.
Change Model (or Support) canister to ABS (or other material).
B.
•
Indicates a mis-match between loaded material and material for which the part (CMB) file was
processed.
•
Replace the flagged material canister with proper type.
Need More Model (or Support) Material.
C.
•
The total available material is less than the estimated amount for the part (CMB file).
•
If the system runs out of material before part completion, system will pause the build until material is
added.
•
Replace flagged material canister.
Need both (or 4 for 4-bay system) canisters present.
D.
•
Indicates that at least one operating canister bay does not have material loaded to the Ready mode
(flashing green LED)
•
System operation will not be significantly compromised by this condition. The air-dryer circuit
performs more efficiently when all operable bays are Ready.
•
Install canisters to the Ready mode for all operating canister bays.
Replace Model (or Support) tip with T12.
E.
•
Indicates a mis-match between installed tip and tip for which the part (CMB) file was processed.
•
Install the correct.
Build Job Warnings
78