Oracle 21C Manual page 198

Table of Contents

Advertisement

Oracle Field Service
Using Core Application
The My Route tile for wide screen contains the Workload bar with the percent of resource work time load for the
selected day.
The Workload is grouped on the basis of these activity statuses:
Pending
Started
Completed
Suspended
Not Done
On a narrow screen device, you see the total number of activities in the route for the selected day.
The tile redirects to the Route Map page if your administrator has configured the Map action link on the Activity List
Context layout page.
This tile is always displayed even if there are no activities in your route.
If an activity is in jeopardy (for example, Missing SLA window), the tile turns orange.
My Team Tile
On the My Team tile, you can see the information about all the teams that you contribute to for the selected day.
This information is displayed only if you assist or are assisted by other resource for the selected day.
Chapter 3
Field Resource Activities
192

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 21C and is the answer not in the manual?

Questions and answers

Table of Contents