5
Quick overview installation
This quick overview informs you in advance about necessary protective measures, mediums necessary for
operation and required connecting elements.
1.
Take safety precautions
DANGER
Danger to life for persons with pacemaker or implanted defibrillator
Magnetic spring rotors consist mainly of neodymium magnets (NdFeB magnets). These
can impair the correct functioning of pacemakers.
X If you have a cardiac pacemaker or implanted defibrillator, keep a minimum distance of
1 m from the device.
2.
Aligne the device to the laser beam and mount stable
•
An alignment tool is included in the scope of delivery
•
You need 6 screws M8x1 and 2 screws for the mounting holes Ø 6.6 mm
3.
Install the water-cooling
•
Connection diameter 12 mm (16 mm for 20 kW-model)
•
Flow rate 7 l/min - 8 l/min (14 l/min - 16 l/min for 20 kW-model)
4.
Connect the compressed air
•
Compressed air according to ISO 8573-1:2010 [6:4:4].
•
0.5 bar - 1 bar
•
Connection diameter 6 mm
5.
Disassemble the inlet aperture cover
6.
Electrical connection
•
Establish voltage supply
•
External safety switch (interlock)
7.
Connect with the PC
•
Connection via Ethernet
8.
Install the LaserDiagnosticsSoftware LDS on the PC
•
Software is part of the scope of delivery
22
MSM+ HB
Chapter 1 on page 9
Chapter 7 on page 27
Chapter 8.9 on page 39
Chapter 8.10 on page 43
Chapter 6 on page 23
Chapter 8.2 on page 36
Chapter 8.3 on page 36
Chapter 9 on page 44
Revision 00 EN - 02/2022